Location: Key Largo, Florida
Completion Date: October 2022
Description: 576 kW installed at seven separate locations in Key Largo for the wastewater treatment district. The solar systems were designed for a diverse type of installation, including pitched roof vacuum station, custom-made carport, and shade canopy structures carefully designed to overcome the challenge of extreme weather in South Florida as well as the corrosive environment of the treatment plant.