KEY LARGO WASTEWATER TREATMENT PLANT

  • Home
  • /
  • KEY LARGO WASTEWATER TREATMENT PLANT

Location: Key Largo, Florida

Completion Date: October 2022

Description: 576 kW installed at seven separate locations in Key Largo for the wastewater treatment district. The solar systems were designed for a diverse type of installation, including pitched roof vacuum station, custom-made carport, and shade canopy structures carefully designed to overcome the challenge of extreme weather in South Florida as well as the corrosive environment of the treatment plant.

RemoteMediaFile_6554101_0_2023_05_31_09_51_12
DCIM100MEDIADJI_0324.JPG
DCIM100MEDIADJI_0310.JPG
DCIM100MEDIADJI_0316.JPG